192003 EGGXZOZX
(NAT-1/2 TRACKS FLS 340/390 INCLUSIVE
JUL 20/1130Z TO JUL 20/1900Z
PART ONE OF TWO PARTS-
A BALIX 61/20 62/30 63/40 62/50 PIDSO
EAST LVLS NIL
WEST LVLS 340 350 360 370
EUR RTS WEST NIL
NAR NIL-
B ERAKA 60/20 61/30 62/40 61/50 SAVRY
EAST LVLS NIL
WEST LVLS 340 350 360 370
EUR RTS WEST NIL
NAR N918B-
C GOMUP 59/20 60/30 61/40 60/50 URTAK
EAST LVLS NIL
WEST LVLS 340 350 360 370 380 390
EUR RTS WEST NIL
NAR N884A N890B-
D SUNOT 58/20 59/30 60/40 59/50 AVUTI
EAST LVLS NIL
WEST LVLS 340 350 360 370 380 390
EUR RTS WEST NIL
NAR N842C N850C-
E PIKIL 57/20 58/30 59/40 58/50 DORYY
EAST LVLS NIL
WEST LVLS 340 350 360 370 380 390
EUR RTS WEST NIL
NAR N790A N788A-
END OF PART ONE OF TWO PARTS)
192003 EGGXZOZX
(NAT-2/2 TRACKS FLS 340/390 INCLUSIVE
JUL 20/1130Z TO JUL 20/1900Z
PART TWO OF TWO PARTS-
F RESNO 56/20 57/30 58/40 57/50 HOIST
EAST LVLS NIL
WEST LVLS 340 350 360 370 380 390
EUR RTS WEST NIL
NAR N756C N746B-
REMARKS.
1. TMI IS 201 OPERATORS ARE REMINDED TO INCLUDE THE
TMI NUMBER AS PART OF THE OCEANIC CLEARANCE READ BACK.
2. SEND RCL 90-30 MINUTES PRIOR TO OCEANIC ENTRY POINT.
3. PBCS OTS LEVELS 350-390. PBCS TRACKS AS FOLLOWS
NO ASSIGNED PBCS TRACKS
END OF PBCS OTS
4. INCLUDE THE MAX LEVEL IN RCL.
5. CLEARANCE MAY DIFFER FROM THE FLIGHT PLAN, FLY THE CLEARANCE.
6. STRATEGIC LATERAL OFFSET PROCEDURE SHOULD BE USED FOR
ALL OCEANIC CROSSINGS. LEFT SLOP IS PROHIBITED.
7. 10 MINUTES AFTER PASSING OEP SQUAWK 2000 UNLESS OTHERWISE
INSTRUCTED.
8. NAVIGATION ERRORS CAN BE PREVENTED BY THE USE OF PROPER FMS
WAYPOINT PROCEDURES.
9. OPERATORS ARE REMINDED TO ONLY USE NAT TRACK DESIGNATORS IN FLIGHT
PLANS WHEN FLYING THE WHOLE LENGTH OF THE NAT TRACK.
10. ADS-C AND CPDLC ARE MANDATED FOR LEVELS 290-410 IN NAT AIRSPACE.
11. UK AIP. ENR2.2 PARA 3.5.2 STATES THAT
NAT OPERATORS SHALL FILE PRM'S.
12. OPERATORS SHOULD REFERENCE NAT DOC 007 CHAPTER 8 AND 13 FOR
SPECIFIC
NAT OCEANIC PROCEDURES.
13. DATA LINK EQUIPPED FLIGHTS NOT LOGGED ONTO DOMESTIC AIRSPACE,
PRIOR TO ENTERING THE SHANWICK OCA, MUST INITIATE A LOGON TO
EGGX 10-25 MINS PRIOR TO OCA ENTRY.
14. EGGX HAS DELAYED IMPLEMENTATION OF OCR UNTIL FURTHER NOTICE.
15. DUE TO THE CONTINUED IMPACT OF PRE BOUNDARY GNSS INTERFERENCE,
CREWS ARE REMINDED OF THE REQUIREMENTS TO NOTIFY OF ANY INTERFERENCE
IN RCL AS PER UK AIP 3.7.4.-
END OF PART TWO OF TWO PARTS)
|